The exemptions given to the parameters have been extended as below for PON equipment under TEC MTCTE.
- The exemption for parameter “Protocol test for any PON interface” has been extended from February 9, 2023 to June 30, 2023
- The exemption for parameter “ECR” for PON equipment has been extended from December 31, 2022 to June 30, 2023 (already a previous notification for this had been issued)
Link to the notification is as below:
https://www.mtcte.tec.gov.in/filedownload?name=downloadDocument_20230206153430.pdf